日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / Business

State Grid Corp asks Brazil to speed up power line approval

By Reuters | China Daily | Updated: 2017-01-05 07:44

State Grid Corp of China has asked the Brazilian government and regulators to speed up environmental licensing of a planned power line connecting to the Belo Monte dam in the Amazon forest, according to official documents and a source with direct knowledge of the matter.

State Grid, the world's biggest utility, fears it could have to delay construction of the line, possibly forcing the third-largest hydroelectric power dam to begin operating in 2019 below full capacity.

Belo Monte, a dam built on the Xingu River in the Amazon forest, will have a total installed capacity of 11,233 megawatts, exceeded only by China's Three Gorges and Brazil's Itaipu dams.

The Chinese firm, together with two units of the Centrais El??tricas do Brasil SA state-controlled utility, has begun work in the first of two transmission lines linking Belo Monte to cities throughout Brazil.

The source said State Grid had expected to receive a preliminary license from Brazil's Ibama environmental agency for a second 2,500 kilometers-long transmission line by October 2016 and authorization to begin construction by February 2017.

Ibama has not issued either of the licenses for the second transmission line, which will carry power to the southeast, Brazil's biggest energy consumer, and other states.

The source said that while the delay did not affect the construction schedule, the preliminary authorization needs to be issued in January, followed by the building authorization in March.

Ibama said its analysis was still underway and it had no estimate of when it would be completed.

Last week, Brazil's power regulator Aneel contacted the Energy and Mining Ministry to ask for support in speeding up the licensing process, an Aneel document seen by Reuters showed.

Construction of the power line, which State Grid estimates will cost 7 billion reais ($2.15 billion), needs to be completed by December 2019 if Belo Monte is to operate in full capacity.

A State Grid document seen by Reuters said that delays in the licensing process would also force it to disburse additional money as it could miss deadlines for receiving funds from state development bank BNDES.

 

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 欧美一级做 | 婷婷综合网站 | 欧美超逼视频 | 国产黄a三级三级看三级 | 国产 欧美 日韩 | 国产区第一页 | 四虎久久久 | 日韩美女中文字幕 | 亚洲91av | 久久新视频 | 淫亚洲 | 黄色片网站国产 | 久久久久久久久免费视频 | 天天拍夜夜操 | 日本一区二区三区精品 | 国产高清一区二区三区四区 | 久久久视频在线 | 亚欧视频在线观看 | 国产专区在线 | 欧美毛片网站 | 中文字幕一区二区三区四区欧美 | 久久久久久一级片 | 日韩久久在线 | 天堂va欧美ⅴa亚洲va一国产 | 深夜福利成人 | 黄色一级片a | 国产女人18水真多毛片18精品 | 日韩一区二区视频 | 欧美成人三级在线观看 | a在线天堂 | 成人激情综合 | av网站免费在线 | 亚洲自拍另类 | 九九九在线视频 | 日韩免费久久 | 桃色网址 | 日本中文在线观看 | 五十路在线播放 | 亚洲网视频 | 韩国精品久久久 | av最新天堂 |