日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

Society

Pollution still hinders water diversion in E China

(Xinhua)
Updated: 2010-07-06 13:26
Large Medium Small

BEIJING - Authorities are still struggling with concerns about the poor water quality of the eastern route of the South-to-North Water Diversion (SNWD) project eight years after the eastern route's construction began.

Vice-Minister of Environmental Protection Zhang Lijun said thousands of polluting paper mills and alcoholic beverage factories have been shut down to improve the water quality of the world's largest water diversion project.

Related readings:
Pollution still hinders water diversion in E China More pollution control for water diversion project
Pollution still hinders water diversion in E China Pollution delays water diversion
Pollution still hinders water diversion in E China Environmental protection in water diversion project stressed

A State Council-approved directive issued before the eastern route's construction required local authorities to ensure the water quality is at least Grade 3, the minimum standard for water that is drinkable after treatment.

Director of the SNWD office under the State Council Zhang Jiyao was quoted as saying by Tuesday's China Daily,"There is still a long way to go before local authorities transform the eastern route into a clean-water corridor and ensure the quality won't decline again."

The construction of key pollution-control facilities is slated for the end of this year, Zhang said.

The facilities include manmade wetlands, which will purify urban waste water, and pipelines linking urban sewage treatment plants, he said.

Measures will prioritize curbing pollution caused by irregular aquaculture, rural sewage and small shipping wharfs scattered along the Grand Canal near the eastern route.

Zhang urged local authorities to monitor pollution upstream of the Danjiangkou Reservoir -- the water supply source of the SNWD's central route -- to prevent pollution from entering the reservoir or contaminating its under-construction trunk canal.

The SNWD project will take water from the massive Yangtze River in the South to satisfy demand in the North's drought-prone cities, such as Beijing and Tianjin. The eastern, central and western routes will each stretch more than 1,000 km.

Construction began on the eastern route in 2002 and a year later on the central route. The eastern route is still on the drawing board and is scheduled for completion by 2013.

The eastern route's first phase involves improving canals to connect river systems to channel water mainly through Jiangsu and Shandong -- the two provinces along the route with the worst water pollution -- to Tianjin.

All 426 pollution control projects have broken ground, and 399, or 94 percent, of them have been completed, Zhang's office reported. Two-thirds of them are operating at more than 80 percent of capacity.

The new industrial pollution control facilities have also achieved more than 90 percent of the standard for sewage discharge .

Testing in the first quarter found water quality is at least Grade 3 in 23 trunk canals, or 66 percent of the sections planned for the eastern route south of the Yellow River.

主站蜘蛛池模板: 天天操网 | 欧美激情天堂 | 久久综合久久久 | 欧美色综合网 | 国产精品毛片一区二区 | www.av在线.com| 免费成人黄色网址 | 日本欧美一区二区三区 | 一区国产视频 | 中文字幕中出 | 国产一区二区三区在线观看视频 | 日韩av一区在线 | 婷婷视频网 | 久久影视一区 | av福利网址| 美女啪啪 | 精品免费久久 | 天堂综合| 亚洲色图25p| 亚洲色域网| 日本黄在线| 免费成人深夜夜行网站 | 日本欧美一区二区三区 | 手机在线成人 | 夜夜操av | 成人亚洲网站 | 男人天堂2021 | 一级欧美日韩 | 欧美一区二区 | 国产伦精品一区二区三区免费 | 99精品欧美一区二区 | 国产精品成人免费精品自在线观看 | 婷婷丁香久久 | 一二三四在线观看视频 | 亚洲欧美日韩免费 | 97色伦| 日韩久久一区二区 | 青青av| 综合99| 成年人在线 | 亚洲色在线视频 |