日批在线视频_内射毛片内射国产夫妻_亚洲三级小视频_在线观看亚洲大片短视频_女性向h片资源在线观看_亚洲最大网

US EUROPE AFRICA ASIA 中文
Business / Industries

How the new high-speed railway came on track

By Hu Yongqi and Xiang Mingchao in Zhengzhou and Yang Wanli in Beijing (China Daily) Updated: 2012-12-27 09:50

All HSR trains are taken to the workshop after they have covered 4,000 km or have been in service for 48 continuous hours. When the kilometers add up to 30,000 km, the trains are taken out of service for an intensive revamp.

"When a train arrives at our workshop, the maintenance engineers check it from top to bottom, including the wheels, the upper and lower electrical circuits and the high-voltage equipment. Each train is worked on by a team of 14, which has to complete all the checks and repairs in two hours and 35 minutes," said Ma Tao, deputy director of the workshop.

The maintenance engineers test 16 wheels in 30 minutes. If they encounter any damage, the engineers are only allowed to begin repairs after receiving permission from the quality-control inspectors. On the night of Dec 20, the engineers discovered that a link connecting the wheels was close to breaking point. A quality-control inspector took two minutes to assess the damage and then gave permission for the part to be replaced. He recorded the entire process on his camera and gave the old component a number for recycling.

"Usually, small parts are more easily broken. Wheels, which are 86 cm in diameter and can last for at least six months, are replaced when the diameter reduces to 79 cm, which takes about the same time," said Luo.

Engineer Cai Quan said he walks at least 15 km every night to fix trains on a predetermined line. "My wife complains that my shoes wear out much faster than my neighbors'," he said. "But that's my job."

More than 100 cameras have been installed in the workshop to monitor all the checkups and repair procedures. Engineers swipe their cards at the entrance which bears the slogan, "Zero tolerance to technical problems", and then all their moves in the workshop can be recorded. A giant screen in the monitoring center shows which engineer is working on which train. When the engineers finish their tasks, a video is prepared to aid investigations in the event of any subsequent accidents.

Drivers are the key

The railway system has upgraded equipment and new technologies. At Zhengzhou East Railway Station, a new system has been built to verify high-speed train tickets through personal ID cards. Even if the passenger has lost their ticket, the system will still allow them to ride the train.

On the fifth floor of a building next to Zhengzhou Railway Station, new drivers practice in a lifesize simulation of a driver's cabin as the rails unfold on an enormous white screen in front of them. Once initiated, the system can offer the drivers eight courses of action to follow and provides changing routes on the screen. A speed limit is set and the drivers learn to take the appropriate course of action when the light on the panel changes color.

Guo Xiansheng, a 33-year-old who now drives the route between Zhengzhou and Wuhan, capital of Hubei province, said the system has helped him follow standard operating procedures.

How the new high-speed railway came on track

An attendant hands a brochure to a passenger on the Beijing-Guangzhou high speed train which went into operation on Wednesday. Wang Zhongju / China News Service

Hot Topics

Editor's Picks
...
主站蜘蛛池模板: 国产午夜精品视频 | 黄色一级大片免费看 | 激情视频一区 | 欧美激情图片 | 欧美专区在线 | 成人av三级| 午夜成人影片 | 免费看日产一区二区三区 | 一区二区三区在线观看免费视频 | 免费日韩一级片 | 91av导航| 国产馆av| 色av综合 | 91手机看片 | 国产黄网在线观看 | 日韩毛片网站 | cao在线视频 | 国产午夜亚洲精品午夜鲁丝片 | 91插插插插插 | 日韩av成人在线观看 | 日韩中文在线播放 | 黄页网站在线观看 | 国产日韩片| 青青激情视频 | 亚洲色图图片 | 神马午夜精品95 | 色播一区 | 五月激情综合网 | 久久黄色一级片 | 久久久久久久久影院 | 久久久久久久久99 | 激情久久久久久久 | 久草日韩| 中文字幕在线观看视频网站 | 天天操导航 | www.精品国产 | 日韩高清一二三区 | 最新中文字幕在线播放 | 天堂男人av | 成人免费精品 | 欧美成人精品在线 |